The Louise von Rothschild School Frankfurt am Main had transferred proceeds from its student company to the Skylife Children Center in 2019 and 2020, but these could not be used immediately due to the coronavirus lockdown, meaning that around EUR 1,000 was still available.

We worked together in October 2023 to determine which renovation work on the school building is most urgent.

  • The toilet block was covered inside and out with waterproof walls and new doors were installed.
  • The partitions in the classrooms were stabilized and repainted to give them a fresh and bright appearance.
  • All desks have been repaired to ensure they are stable and usable.
  • The floor at the back of the hall was lowered to create more usable space for all desks and students.
Toilette before renovationToilette after renovation